Prior to beginning any installation, be sure you have a set of the most current shop drawings on the job site. Review and understand all information on these drawings prior to beginning installation. Inventory the GRG pieces you have received and compare to the shop drawings. Confirm quantities and dimensional correctness prior to beginning installation. If you have any questions, please call your Melton Classics representative at 866-867-8771.
Prior to beginning installation, unwrap or uncrate a random sampling of pieces. Column covers may or may not be shipped in matching pairs. If they are shipped in matching pairs, the matching nomenclature will be clearly detailed on the Bill of Lading or Packing Slip, and the pieces themselves. In theory, all pieces of a particular type should match. Sometimes, in shipping, handling and storage some pieces can become distorted. These distortions can usually be corrected with a fairly small amount of effort.
Inspect the insides of the pieces for any protrusions or obstructions that will interfere with matching, mating or attachment of pieces. Use a belt sander, rasp, saw, or grinder for removal.
SINGLE HIGH INSTALLATION
DOUBLE HIGH INSTALLATION
PATCHING AND JOINT FINISHING
STORAGE
P.O. Box 465020 • Lawrenceville, Georgia 30042 • Telephone 866-867-8771 • Facsimile: 770/962-6988